SolarEdge
Join The Journey Towards A Cleaner, Greener & Reliable Future
- Story
- Team
- Cooperation
EST. 2010
About Us
In the year 2010-11 when the concept of renewable energy was not that much popular in Pakistan as it was considered to be an expensive alternate to traditional grid power, but in far flanged rural areas of Balochistan and Sindh region a problem was surfacing especially in Balochistan region as people and departments both govt and semi govt we waiting for the grid to provide power connection to energize their tube-wells for agricultural needs but in order to provide energy to those areas basic infrastructure for transfer of energy was required that needed lot of time and expense considering this factor SolarEdge started its operation to overcome this issue and had the honor to install first solar based water supply scheme at a government funded scheme located in Balochistan and from there on we have successfully completed numerous private, government and semi government projects across Pakistan.
Moving Forward SolarEdge established its own manufacturing unit for solar mounting structures in 2019, that is now offering universal panel type moveable and fixed mounting structures to its customers.
With years of experience in renewable energy you can rely on SolarEdge as we are committed to provide you industry leading quality services.

Our Services

System Design
After reviewing your projects energy requirement a basic system design estimate will be provided.

Cost Estimation
A detailed costing chart will be shared with the client in regard to their designed system.

Project Implementation
After clients approval project will be implemented by our trained and professional team.
Our Process
its very easy you will share your required load we would provide you with best possible options followed up with a mutual contract and we would start implementation of your project.
Requirments
Sign Contract
Regular Updates
Implement!
Join Us For Better Future
Save the environment for your future generations
Details regarding every important phase of the project
Stop Worrying about huge electricity bills
start running your tubewells on solar energy
Solar Adoption
Due to overall higher cost of generating electricity it has become very difficult for masses to afford their electricity bills due to which a overwhelming increase has been witnessed in solar adoption across Pakistan
we Care for you
Get Free Qoute
email, whatsapp us your requirements or share your last electricity bill with us to get an estimated cost to shift on solar energy from our team.